Fill in a Valid Missouri Pw 2 Form Open Document Now

Fill in a Valid Missouri Pw 2 Form

The Missouri PW-2 form serves as a Prevailing Wage Project Notification, crucial for contractors in Missouri engaged in public works projects. Designed by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards, this form ensures compliance with Sections 290.210 through 290.340 and 290.550 through 290.580 of the Revised Statutes of Missouri by collecting essential project and contractor information. To ensure legal compliance and streamline the process of participating in public works projects, consider filling out the form attentively.

For assistance in accurately completing the Missouri PW-2 form and to ensure all requirements are met for your public works project, click the button below.

Open Document Now

The Missouri Department of Labor and Industrial Relations Division of Labor Standards has established a necessary component in the sphere of labor rights and standards through the creation of the Prevailing Wage Project Notification, known as the PW-2 form. This particular document serves a pivotal role in ensuring that workers on public works projects are compensated fairly according to the prevailing wage requirements codified in Sections 290.210 to 290.340 and 290.550 to 290.580 of the Revised Statutes of Missouri. The form encompasses critical information, such as the date of notification, details surrounding the annual wage order, project descriptions, estimated costs, and specific location information, alongside anticipated timelines for bid solicitation, contract awards, and project completion. Additionally, it addresses the integration of federal funds into contracts and calls for identification of the general contractor and any subcontractors involved. The rigorous detail required by the form underscores Missouri's commitment to upholding labor rights and standards, providing transparency and compliance in public works contracts. By explicitly laying out project specifics and the entities involved, the PW-2 form acts as both a notification and an assurance of adherence to the state's prevailing wage laws, ensuring that all workers receive just remuneration for their labor on projects that shape the infrastructure and public services within the state.

Example - Missouri Pw 2 Form

MISSOURI DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS

DIVISION OF LABOR STANDARDS

PREVAILING WAGE

PROJECT NOTIFICATION – CONTRACTOR INFORMATION NOTIFICATION

The information below is requested pursuant to Sections 290.210 through 290.340 and 290.550 through 290.580

REVISED STATUTES OF MISSOURI.

1.

Date of Notification

 

2. Annual Wage Order No. Included in Bid Specifications

 

 

 

 

 

3.

Popular or Descriptive Name of Project

 

 

 

 

 

 

 

 

4.

Estimated Project Cost of Completion

 

 

 

 

(total construction contracts to be awarded)

$

 

 

 

 

 

5.

Exact Location of Project *Specify Name of 1County and 2City, Village or District

 

County

City or Village

 

Township

 

 

 

 

 

6.

Official Name of Public Body or Agency

 

 

 

 

 

 

 

 

7.

Name of Contact Person

 

 

8. Phone Number (include area code)

 

 

 

 

 

9.

Address

 

 

 

10.

E-mail Address

Website

 

 

 

 

 

11.

Anticipated Date for Soliciting or Advertising for Bids

12.

Anticipated Date for Contract Awarding

 

 

 

 

13.

Proposed Date for Start of Work on Project

14.

Estimated Date of Project Completion

 

 

 

 

15.

Will There Be Any Federal Funds Used in this Contract?

Yes

No

 

 

 

16.

Contractor Information Notification (Optional, please provide if available.)

 

General Contractor: Name

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

List all Sub-Contractors:

 

 

 

 

 

Name

 

 

 

 

 

 

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

Name

 

 

 

 

 

 

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

The state of Missouri requires workers on public works projects be paid prevailing wage. Public bodies have certain duties required to fulfill under this law (Section 290.210 - 290.340 RSMo).

Mail, Fax or E-mail completed form to:

DIVISION OF LABOR STANDARDS

Attn: Prevailing Wage Section

P.O. Box 449

Jefferson City, MO 65102-0449

Phone: 573-751-3403

Fax: 573-751-3721

E-mail: prevailingwage@dolir.mo.gov

Website: www.dolir.mo.gov/ls

PW-2 (04-06) AI

File Attributes

Fact Name Detail
Purpose The Missouri PW-2 form is used for notifying the Division of Labor Standards about the details of a public works project, ensuring compliance with prevailing wage laws.
Governing Laws The form is governed by Sections 290.210 through 290.340 and 290.550 through 290.580 of the Revised Statutes of Missouri, which establish the requirements for prevailing wage on public works projects.
Required Information It includes details such as date of notification, project description, location, official name of public body, contact information, and anticipated project timelines.
Submission Details The completed form can be submitted via mail, fax, or e-mail to the Division of Labor Standards, Prevailing Wage Section.
Contact Information Requirement Contact details for both the public body or agency and the general contractor, including any subcontractors, must be provided.
Federal Funds Note The form inquires whether federal funds will be used for the contract, highlighting the intersection of state and federal regulations on public works projects.
Prevailing Wage Compliance By submitting this form, contractors and public bodies affirm their obligation to comply with Missouri’s prevailing wage laws, ensuring fair compensation for workers.

How to Write Missouri Pw 2

Filling out the Missouri PW-2 form is a crucial step for contractors working on public works projects in the state. This form ensures compliance with prevailing wage laws, requiring contractors to share project details with the Missouri Department of Labor and Industrial Relations. Following a step-by-step guide simplifies the process, ensuring all necessary information is accurately provided. Let's walk through the essential steps to complete this form.

  1. Locate and record the Date of Notification at the top of the form.
  2. Enter the Annual Wage Order No. Included in Bid Specifications to ensure alignment with current wage standards.
  3. Provide the Popular or Descriptive Name of Project for easy identification.
  4. Estimate and fill in the total Project Cost of Completion capturing all construction contracts to be awarded.
  5. Specify the project's precise location by noting the Name of County and City, Village, or District as required.
  6. Enter the Official Name of Public Body or Agency overseeing the project.
  7. Provide the Name of Contact Person, ensuring there's a direct line for any inquiries.
  8. Include the Phone Number with the area code of the contact person.
  9. Fill in the Address, including E-mail Address and Website (if available) for the public body or agency.
  10. Record the Anticipated Date for Soliciting or Advertising for Bids and the Anticipated Date for Contract Awarding to align with project timelines.
  11. Enter the Proposed Date for Start of Work on Project and the Estimated Date of Project Completion to provide a clear timeline.
  12. Indicate whether Federal Funds will be used in the contract by checking Yes or No.
  13. If available, list the General Contractor information including Name, Address, City, State, and Zip.
  14. Optionally list all Sub-Contractors with their respective Names, Addresses, Cities, States, and Zips.
  15. Once completed, review the form to ensure all information is accurate and then mail, fax, or email it to the addresses provided.

After submitting the PW-2 form, the contractor has taken an essential step in complying with Missouri's prevailing wage requirements. This detailed notification assists the state in enforcing wage standards, ensuring fairness and transparency across public works projects. By taking the time to accurately complete and submit this form, contractors contribute to a well-regulated construction environment in Missouri.

What You Should Know About This Form

What is the Missouri PW-2 form?

The Missouri PW-2 form, standing for Prevailing Wage Project Notification – Contractor Information Notification, is a document used by contractors to provide the Division of Labor Standards with essential details about public works projects in Missouri. This form is a requirement under the Revised Statutes of Missouri Sections 290.210 through 290.340 and 290.550 through 290.580, aiming to ensure that workers are paid the prevailing wage on public works projects.

Who needs to fill out the PW-2 form?

Contractors who are involved in public works projects in Missouri are required to complete and submit the PW-2 form. This includes both general contractors and sub-contractors participating in projects funded by public bodies or agencies.

What information is needed to complete the form?

Completing the PW-2 form requires various pieces of information related to the project, including:

  1. Date of Notification
  2. Annual Wage Order Number
  3. Name and Description of Project
  4. Estimated Project Cost
  5. Exact Location of the Project
  6. Official Name of the Public Body or Agency
  7. Contact Person's Name and Contact Information
  8. Project Timelines (Anticipated Dates for Bidding, Awarding, Start and Completion)
  9. Federal Funding Usage
  10. General and Sub-Contractor Information (if available)

How is the PW-2 form submitted?

The completed PW-2 form can be submitted to the Division of Labor Standards through mail, fax, or email. The contact details for submission are provided on the form, including the postal address, fax number, and email address.

Is there a deadline for submitting the PW-2 form?

While the form itself does not specify a strict deadline, it is generally expected that the form should be submitted as soon as the contract information is finalized, well ahead of the project start date. This ensures compliance with Missouri's prevailing wage requirements and facilitates the smooth running of the project.

What happens if the PW-2 form is not submitted?

Failure to submit the PW-2 form can result in violations of Missouri's prevailing wage laws. Such violations may lead to penalties, including fines, and can potentially disqualify contractors from participating in future public works projects.

Can the PW-2 form be amended after submission?

Yes, if there are any changes to the project details or contractor information after the initial submission, it is important to notify the Division of Labor Standards as soon as possible. Amendments can be submitted using the same methods as the original form.

Where can I find a copy of the PW-2 form or get more information?

Copies of the PW-2 form and further information about prevailing wage requirements in Missouri can be found on the Missouri Department of Labor and Industrial Relations' website. Here, contractors can also access guidance and support for completing and submitting the form.

Common mistakes

Filling out the Missouri PW-2 form requires attention to detail and a complete understanding of the information being requested. Errors in completing this document can lead to delays or complications. Here are nine common mistakes made during this process:

  1. Not including the Date of Notification: It is crucial to provide the date when the PW-2 form is filled out as it marks the official start of the notification process.
  2. Overlooking the Annual Wage Order Number: This number, relevant to the bid specifications, must be accurately included to ensure compliance with prevailing wage laws.
  3. Failing to specify the Project's Description or Name clearly: A concise yet descriptive name or title helps in identifying the project throughout its duration.
  4. Underestimating or inaccurately reporting the Estimated Project Cost: Accurate cost estimation is vital for proper budgeting and to adhere to financial regulations.
  5. Lack of specifics in the Project's Location: Providing detailed information including the county, city, village, or district is essential for correct project identification.
  6. Forgetting to include the Name of the Public Body or Agency: This information connects the project to the responsible governmental or public entity.
  7. Not providing a Contact Person's Details: A designated contact person’s name, phone number, and address offer a direct line for inquiries or clarifications.
  8. Omission of Key Project Dates: Including the anticipated dates for soliciting bids, contract awarding, work commencement, and project completion are critical timeline components.
  9. Ignoring Federal Funds Usage: Indicating whether federal funds will be used in the project is mandatory for determining specific wage regulations.

Mistakes in these areas can significantly impact the project's compliance with Missouri's prevailing wage laws. Carefully reviewing the form before submission can prevent these errors.

Additionally, when providing contractor information, ensure that all fields are filled out accurately. This includes the general contractor and all sub-contractors’ names and addresses. It’s not just a formality; it’s a legal requirement to ensure all contractors are recognized and properly documented, safeguarding all parties involved and ensuring compliance with state laws.

  • Double-checking entries for accuracy prevents rejections.
  • Maintaining records of the form submission helps track compliance and timelines.
  • Seeking clarification on unclear sections from the Division of Labor Standards avoids assumptions that could lead to errors.

Completing the Missouri PW-2 form with accuracy and thoroughness is a significant responsibility that requires careful attention to detail. By avoiding these common mistakes, contractors can ensure a smoother process in observing Missouri's prevailing wage laws.

Documents used along the form

When navigating through the requirements for public works projects in Missouri, especially those subject to prevailing wage laws, it becomes evident that the Missouri PW-2 form stands as a significant first step. This form acts as a notification of contractor information to the Missouri Department of Labor and Industrial Relations. However, understanding and completing the PW-2 is just the beginning. Other forms and documents often work in tandem with the PW-2 to ensure compliance with state laws and regulations. Below is a list of additional documents that are frequently used alongside the PW-2 form.

  • Annual Wage Order: This document outlines the prevailing wages for various types of labor and trades specific to the county where the project is located. It is crucial for determining the appropriate wage rates for workers on a project.
  • Certified Payroll Report: Often required on a weekly basis, this report details the wages paid to each worker. It serves as proof that workers are paid according to the prevailing wage rates established for the project.
  • Contract Award Notice: This form notifies the state that a contract has been awarded for the project. It includes details about the project, the winning bidder, and the contract amount, ensuring transparency and compliance with the bidding process.
  • Worker Classification Form: This document helps in determining the classification of workers based on the types of tasks they perform. Correct classification is essential for applying the correct prevailing wage rates.
  • Request for Wage Determination: If specific wage determinations are not covered in the Annual Wage Order, this request form can be submitted to seek clarification or establishment of wage rates for particular job classifications.
  • Project Completion Report: This form signals the completion of the project. It provides a summary of the project, including any changes in scope, final costs, and certification that all wages paid were in compliance with prevailing wage laws.

The harmonious interplay between these documents and the PW-2 form facilitates adherence to Missouri’s prevailing wage statutes, ensuring that laborers on public works projects are paid fairly. Professionals handling these forms must pay careful attention to detail and stay informed about legal updates to maintain compliance throughout the duration of a project. This orchestrated effort supports not only legal compliance but also promotes ethical labor practices within the state.

Similar forms

The Missouri PW-2 form, required by the Missouri Department of Labor and Industrial Relations, is designed for contractors to notify the Department of Labor about a public works project, ensuring compliance with the state's prevailing wage laws. This form contains sections for project notification, contractor information, and mandatory disclosures about the use of federal funds. It is similar to other documents used in the construction and public works sector, which also aim to ensure compliance with labor standards and fair wage laws.

One document similar to the Missouri PW-2 form is the Form WH-347, issued by the U.S. Department of Labor. This form serves as a "Payroll Certification for Public Works Projects" and is federallly mandated for contractors and subcontractors working on federally funded or assisted contracts in excess of $2,000, to certify the wages paid to their laborers. Both forms require detailed information about the project, including location, anticipated start and completion dates, and a breakdown of contractors and subcontractors involved. However, Form WH-347 places a stronger emphasis on reporting the wages of each employee, reflecting the federal focus on enforcing the Fair Labor Standards Act (FLSA) alongside state-specific prevailing wage laws.

The Missouri PW-2 form also shares similarities with the Contractor’s Annual Prevailing Wage Report used in various states, which typically require annual submission by contractors who work on public projects. These reports aim to ensure that workers receive the prevailing wages mandated by state law. Like the PW-2 form, these annual reports collect comprehensive project information and labor data, but they differ in their frequency and scope of reporting. The annual reports aggregate data over a year, providing a retrospective overview of compliance, whereas the PW-2 form focuses on individual projects and is project-specific in its outreach and compliance efforts.

Furthermore, the Missouri PW-2 form resembles the Project Registration forms that some states require for public works projects. These forms often initiate the oversight process, making sure that projects adhere to state labor laws from the outset. While both the Missouri PW-2 form and these registration forms collect foundational project details, such as the project's name, cost, location, and the contractors involved, Missouri's form is distinct in its integration with the state's prevailing wage laws, explicitly designed to facilitate the enforcement of wage standards as determined by the Missouri Department Viewer of labor standards. In contrast, Project Registration forms might serve a broader range of functions, from labor law compliance to project tracking and budget oversight.

Dos and Don'ts

When filling out the Missouri PW-2 form, there are important dos and don’ts that must be followed to ensure accurate and compliant submission. Here's a list of considerations to keep in mind:

  • Do verify the accuracy of all information before submission, including the annual Wage Order No. and contractor information.
  • Do include the popular or descriptive name of the project to provide clear identification.
  • Do ensure that the estimated project cost of completion is accurately calculated to include the total of all construction contracts to be awarded.
  • Do specify the exact location of the project, including the name of the county, city, village, or district to avoid any confusion.
  • Do provide the official name of the public body or agency, along with the name of a contact person, their phone number, address, and email address for efficient communication.
  • Don't leave out the anticipated dates for soliciting or advertising for bids, awarding the contract, the start of work on the project, and the estimated date of project completion as these are critical timelines.
  • Don't forget to indicate whether federal funds will be used in the contract. This information is crucial and affects the application of prevailing wage law.
  • Don't omit contractor information. If available, include the general contractor and all subcontractors' names and contact details.
  • Don't submit the form without double-checking all sections for completeness and accuracy to prevent delays or issues with the compliance of prevailing wage regulations.

By adhering to these guidelines, individuals can ensure that the Missouri PW-2 form is submitted accurately and in compliance with state requirements, facilitating smoother project operations and compliance with prevailing wage laws.

Misconceptions

When navigating the legal landscape of the Missouri Prevailing Wage Project Notification (PW-2 form), individuals and contractors may encounter common misconceptions. Understanding these inaccuracies is crucial for ensuring compliance with state regulations and facilitating smooth operations on public works projects.

  • Misconception 1: The PW-2 form is only for contractors directly hired by the state.

    This is a misunderstanding. While the form is indeed used in the context of public works, it is not exclusively for contractors directly contracted by state agencies. Any contractor or subcontractor working on a public project, regardless of their direct or indirect relationship with the state, must complete and submit the PW-2 form as part of the prevailing wage law compliance.

  • Misconception 2: The submission of the PW-2 form is optional.

    Contrary to this belief, submitting the PW-2 form is a mandatory step for all contractors and subcontractors involved in public works projects in Missouri. The form is essential for the Missouri Department of Labor and Industrial Relations to ensure that all workers are paid the prevailing wage as required by law.

  • Misconception 3: The PW-2 form does not need to be updated once submitted.

    This assumption could lead to compliance issues. Any changes to information previously reported, such as project dates, contractors, or costs, require an updated PW-2 form to be submitted. Keeping the form current helps the Department of Labor and Industrial Relations maintain accurate records and enforce prevailing wage laws effectively.

  • Misconception 4: The estimated project cost and completion dates are not important details on the PW-2 form.

    Every piece of information requested on the PW-2 form serves a purpose. The estimated project cost and completion dates are critical for determining the prevailing wage rates and ensuring that they are applied correctly throughout the duration of the project. Providing accurate and comprehensive details supports transparency and fair labor practices.

  • Misconception 5: Federal funding questions on the PW-2 form are irrelevant for state projects.

    While it may seem like a detail more pertinent to federal projects, indicating whether federal funds are being used on a state public works project is crucial. The use of federal funds can trigger additional federal labor standards, such as the Davis-Bacon Act requirements, which could affect the prevailing wage determinations and compliance strategies for the project.

Dispelling these misconceptions is vital for contractors and public bodies involved in Missouri's public works projects. Understanding the requirements and purpose of the PW-2 form ensures smoother project execution and adherence to state laws designed to protect worker rights and ensure fair compensation.

Key takeaways

When filling out and using the Missouri PW-2 form, which is essential for contractors engaging in public works projects in Missouri, it's important to ensure accuracy and completeness to comply with the state's prevailing wage laws. Here are key takeaways to guide you through the process:

  • Understanding the Purpose: The Missouri PW-2 form is a Prevailing Wage Project Notification used by contractors to provide essential project details to the Division of Labor Standards. Its main aim is to ensure compliance with Missouri's prevailing wage laws.
  • Completing Project Details: Accurately fill in all required sections such as the date of notification, project name, estimated project cost, and exact location. This information is crucial for project identification and verification.
  • Inclusion of Contractor Information: Though optional, providing general contractor and sub-contractor information helps maintain transparency and facilitates communication between parties and the Division of Labor Standards.
  • Compliance with Prevailing Wage Laws: By submitting this form, contractors affirm their obligation to pay the prevailing wage on public works projects, as mandated by Missouri law (Section 290.210 - 290.340 RSMo).
  • Deadlines and Key Dates: Be attentive to the anticipated dates for bidding, contract awarding, project start, and estimated completion. These timelines are important for project planning and maintaining compliance.
  • Utilization of Federal Funds: Clearly indicate whether federal funds will be used for the project. This information is critical as it may affect the application of prevailing wage rates and requirements.
  • Submission Methods: The form can be submitted via mail, fax, or email to the Division of Labor Standards, providing flexibility for contractors to comply with the notification requirement.

Ensuring the complete and accurate submission of the Missouri PW-2 form is crucial for contractors to meet their legal obligations under Missouri's prevailing wage laws and for the successful execution of public works projects.

Please rate Fill in a Valid Missouri Pw 2 Form Form
4.67
(Incredible)
221 Votes