Fill in a Valid Mo 780 0925 Form Open Document Now

Fill in a Valid Mo 780 0925 Form

The MO 780 0925 form is an application utilized by the Missouri Department of Natural Resources, specifically within the Water Protection Program, Water Pollution Branch. It serves as a comprehensive application for the approval or issuance of permits related to Concentrated Animal Feeding Operations (CAFOs), including options for construction, operation, ownership transfer, permit renewals, and more. This form is essential for ensuring compliance with regulatory standards and maintaining environmental protection.

For those looking to either establish or maintain a CAFO in Missouri, accurate completion and submission of this form is a critical step. By providing detailed information about the operation, applicants communicate with state regulators about their environmental management practices.

Ready to start your application process for a CAFO permit or approval? Ensure your compliance by clicking the button below to fill out the MO 780 0925 form accurately.

Open Document Now

The Missouri Department of Natural Resources' Water Pollution Branch offers a comprehensive framework for managing the environmental impact of concentrated animal feeding operations (CAFOs) through its MO 780 0925 form. This document serves as a pivotal application for individuals and entities seeking approval or permits to either establish or continue operating CAFOs, reflecting the state’s commitment to safeguarding water quality. The form categorizes applications into several types, such as construction applications, operating applications, and ownership transfers, among others, clearly delineating the process for new operations, renewals, modifications, and exemptions. Applicants are required to provide detailed information about the operation location, owner and continuing authority information, and a meticulous description of the system, including any changes since the previous permit. Additionally, the form mandates engineering certification for construction, emphasizing the necessity of adherence to approved plans and the need for accurate and comprehensive documentation to support the application. This meticulous approach underscores Missouri's stringent regulatory environment designed to minimize the environmental footprint of CAFOs while ensuring compliance with both state and federal guidelines.

Example - Mo 780 0925 Form

MISSOURI DEPARTMENT OF NATURAL RESOURCES

WATER PROTECTION PROGRAM, WATER POLLUTION BRANCH

FORM F – APPLICATION FOR APPROVAL OR PERMIT FOR CONCENTRATED ANIMAL FEEDING OPERATION

FOR AGENCY USE ONLY

CHECK NO.

DATE RECEIVED

FEE SUBMITTED

 

 

TYPE APPLIED FOR: (CHECK ONE BOX IN EACH OF COLUMN A, B, AND C.) (SEE INSTRUCTIONS FOR APPROPRIATE FEE TO BE SUBMITTED WITH APPLICATION.)

A

B

C

 

 

 

 

 

CONSTRUCTION

LETTER OF APPROVAL

PERMIT RENEWAL

PERMIT NO.

OPERATING

GENERAL PERMIT

NEW OPERATION

MO –

OWNERSHIP TRANSFER

SITE-SPECIFIC PERMIT

SYSTEM MODIFICATION

EXPIRATION DATE

 

EXEMPTION REQUEST

OTHER

 

 

 

 

 

CONSTRUCTION APPLICATION: Complete part I of this form.

OPERATING APPLICATION: Complete parts I and II of this form. OWNERSHIP TRANSFER: Complete part I of this form.

PART 1 – APPLICANT INFORMATION

1.OPERATION

ADDRESS (PHYSICAL)

 

PHONE

 

 

 

FAX

 

 

CITY

STATE

 

ZIP CODE

 

 

 

 

 

2.

SYSTEM LOCATION

1/4

1/4 SEC.

TWP

RGE

COUNTY

 

 

 

 

 

 

 

 

 

3.

OWNER

 

 

 

 

PHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAX

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

CITY

 

 

STATE

 

ZIP CODE

 

 

 

 

 

 

 

 

 

4.

CONTINUING AUTHORITY NAME

 

 

 

 

PHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAX

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

CITY

 

 

STATE

 

ZIP CODE

 

 

 

 

 

 

 

 

 

5. CURRENT APPROVAL OR PERMIT NUMBERS

LATITUDE

LONGITUDE

6. BRIEF DESCRIPTION OF SYSTEM

7. ANY CHANGES IN THE SYSTEM SINCE PREVIOUS PERMIT?

YES

NO (IF YES, DESCRIBE, ATTACH ADDITIONAL SHEETS IF NECESSARY)

8.ATTACH ALL PERTINENT INFORMATION (SEE INSTRUCTIONS):

9.I CERTIFY THAT I AM FAMILIAR WITH THE INFORMATION CONTAINED IN THE APPLICATION AND ATTACHMENTS, AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF, SUCH INFORMATION IS TRUE, COMPLETE AND ACCURATE.

PRINT NAME AND TITLE

APPLICANT’S SIGNATURE

DATE

PART II – ENGINEERING CERTIFICATION (AFFIX SEAL IN SPACE PROVIDED)

1.CONSTRUCTION UNDER CONSTRUCTION PERMIT OR APPROVAL NO. (WRITE “NONE” IF CONSTRUCTION APPROVAL WAS NOT OBTAINED )

2.IF THE ANSWER TO ITEM 1 IS “NONE”, COMPLETE ITEM 7 ON PART ONE.

3.IF THE SYSTEM CONSTRUCTED IS DIFFERENT FROM THE CONSTRUCTED IS DIFFERENT FROM THE CONSTRUCTION APPROVAL, ATTACH “AS-BUILT” PLANS, INDICATE CHANGED PORTIONS, AND EXPLAIN THE REASONS FOR THE CHANGES.

4.CERTIFICATION:

I, THE PROJECT ENGINEER ON THE ABOVE-DESCIRBED SYSTEMS, HEREBY CERTIFY THAT I HAVE INSPECTED THESE SYSTEMS AND FIND THEM TO BE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND RECOMMEND THEIR ACCEPTANCE AND APPROVAL BY THE MISSOURI CLEAN WATER COMMISSION. THIS CERTIFCATION INCLUDES: LAGOONS OR STORAGE BASINS SEAL, WATER-LEVEL-MEASUREMENT GAUGES, PUMPING AND PIPING SYSTEMS, LAND-APPLICATION SYSTEM, OPERATING MANUAL, RECORD- KEEPING SYSTEM AND TRAINING, AND OTHER CONDITIONS CONTAINED IN THE CONSTRUCTION DOCUMENTS AND DEPARTMENT APPROVAL OR PERMIT.

PROJECT ENGINEER’S SIGNATURE

DATE

 

 

ENGINEER SEAL

MO 780-0925 (11-11)

PAGE 1 OR 1

INSTRUCTIONS FOR APPLICATION FROM F

FOR CONCENTRATED ANIMAL FEEDING OPERATION

Submit applications to the address shown on the application form to: Attention NPDES Permits and Engineering Section.

A.CONSTRUCTION PERMIT

Refer to 10 CSR 20-6.300, 10 CSR 20-8.020 and appropriate reference documents. Submit the following information:

1.Application Form F, Form I and/or Form R for site-specific permit.

2.Permit Fee: construction fee is $750. See below, C. Transfer of Ownership, for permit modification fees.

3.If Class I Facility and certain Class IB systems, submit application Form E and G for storm water land disturbance permit. Contact the department for additional information.

4.If applying for a site-specific operating permit, submit mailing list for all property owners for land application sites and all adjacent property owners.

5.Name and address of any local planning and zoning authority.

6.Narrative Summary of the Project Design.

7.Location Map: Topographic map showing building, lagoons, land application sites, property boundary and general features.

8.General layout drawings.

9.Operation and Maintenance Plan.

10.Geologic Report by the Geological Survey and Resource Assessment Division.

11.Soils Report.

12.Design Worksheets.

13.Construction Plan Drawings and specifications.

14.Nutrient Management Plan

15.Verification of compliance with Neighbor Notice.

16.Other relevant information, as needed.

B. OPERATING LETTER OF APPROVAL, GENERAL PERMIT OR SITE-SPECIFIC PERMIT

If you are applying to transfer from an operating Letter of Approval to a General Permit, complete items 1, 2 and 3. For other applications complete all applicable items, as follows:

1.Application Form F, Form I and/or Form R for site-specific permit.

2.Permit Fee: There is no fee for a letter of approval. General permit fee is $150.00 for life of the permit (up to 5 years). For a new (first time) site-specific permit, the permit fee ranges from $1,500 to $5,000, based on the number of animals; contact the department or refer to 10 CSR 20-6.011 for the appropriate permit fee. If you are applying for renewal of a site-specific permit, do not submit a permit fee; your permit fee will be billed to your on an annual basis. See below, C. Transfer of Ownership, for permit modification fees.

3.For new systems submit engineering certification for construction completed under a construction approval or construction permit. Submit as- built engineering plans, if construction approval/permit was not obtained.

4.Submit Items 6 through 15 listed under Section A of these instructions, if any of this information is NOT already on file with the construction application. This information must be updated as part of the permit renewal application.

5.If applying for a site-specific operating permit, submit a current mailing list for all property owners of land application sites and all adjacent property owners.

6.Name and address of any local planning and zoning authority.

7.Other relevant information, as needed.

C. TRANSFER OF OWNERSHIP

An operating letter of approval, construction permit or general operating permit may NOT be transferred. A site-specific operating permit may be transferred to a new owner if there have been no significant changes in the facility. To request a transfer, the new owner shall check the ownership transfer request block at the top of this application form and complete Part I. Signature of the transfer application will be the new owner’s certification that he has read and understands the operating requirements of the facility and that the wastewater loading and system operation is substantially unchanged. Permit modifications, including transfers, are subject to the following fees: 25% of annual fee. Business name and address changes where owner, operator and continuing authority remain and same are not considered transfers.

D.ENGINEERING CERTIFICATION

Part II, Item 4 of the application form contains a list of items that must be inspected and certified as completed in order to obtain a Letter of Approval for operation or an operating permit.

Exception: Partial certification or certification by subcontractors shall be attached to the application if consideration of these is requested due to special circumstances. Justification for exceptions must be provided and substantiated by as-built plans and operating manuals.

MO 780-0725 (11-11)

PAGE 2 OF 2

File Attributes

Fact Name Description
Form Purpose The MO 780 0925 form is used for applying for approval or permits for concentrated animal feeding operations (CAFOs) in Missouri, covering situations such as construction, operation, ownership transfer, and system modifications.
Application Requirements Applicants are required to complete different sections based on the type of approval or permit they seek, submit the correct fee, and provide necessary supporting documents including, but not limited to, engineering certifications, narrative summaries, operation plans, and compliance verifications.
Governing Law The application process and requirements are governed by Missouri's Clean Water Law, specifically referenced under codes such as 10 CSR 20-6.300 and 10 CSR 20-8.020, which outline the regulatory standards and procedures for CAFOs.
Permit Fees The form details various fees associated with the permit application process, such as construction permit fees ($750), general permit fees ($150 for the life of the permit), and site-specific permit fees which vary according to the scale of the operation. Modification and ownership transfer fees are also specified.

How to Write Mo 780 0925

Filling out the MO 780 0925 form is a critical step toward regulatory compliance for operators of Concentrated Animal Feeding Operations (CAFOs) in Missouri. This form helps ensure that CAFOs adhere to regulations designed to protect water quality. The directions provided aim to simplify the process. By following each step carefully, applicants can confidently submit their application to the Missouri Department of Natural Resources, Water Protection Program.

  1. Review the form to determine which type of application you need to submit (Construction, Operating Application, or Ownership Transfer).
  2. In Section A, determine and check the appropriate box for the type of permit or approval you are seeking. This involves selecting one option each from columns A (Construction, Operating, Ownership Transfer), B (General Permit, Site-Specific Permit, Other), and C (for agency use).
  3. Under "Applicant Information" in Part I:
    • Enter the operation's physical address, including city, state, and zip code, alongside the phone and fax numbers.
    • Provide the system location as described by quarter sections, township, range, and county.
    • Fill in the details of the owner and continuing authority, including name, address, city, state, zip, and contact information.
    • Document current approval or permit numbers, latitude, and longitude of the operation.
    • Offer a brief description of the system and note any changes since the last permit if applicable.
    • Attach all pertinent information as instructed in the form guidelines.
    • Verify the application by printing the name and title of the applicant, then sign and date the document.
  4. If applying for a construction application or ownership transfer, complete Part I only. For operating applications, proceed to complete Part II as well.
  5. In Part II – Engineering Certification, include:
    • The construction under construction permit or approval number. Write "none" if no construction approval was obtained.
    • Attach "as-built" plans if the constructed system differs from what was approved, explain changes, and indicate any altered portions.
    • The project engineer must certify the system's construction by signing and dating this section and affixing their seal.
  6. Review all parts of the application to ensure completeness and accuracy. Confirm that all required attachments, including engineering certifications, plans, reports, and additional information requested in the instructions, are included.
  7. Submit the completed application along with any applicable fees to the address provided on the form, specifically to the Attention of the NPDES Permits and Engineering Section.

Once submitted, the application will be reviewed by the Missouri Department of Natural Resources. Applicants may be contacted for further information or clarification. Ensuring the application is complete and accurate can facilitate a smoother review process. Remaining responsive to any inquiries from the department can further expedite the approval or permit process.

What You Should Know About This Form

What is the MO 780 0925 form used for?

The MO 780 0925 form is utilized by the Missouri Department of Natural Resources, specifically within the Water Protection Program's Water Pollution Branch. It serves as an application for approval or permit for concentrated animal feeding operations (CAFOs). This form is crucial for obtaining either construction approval, an operating permit, ownership transfer approvals, or other related permissions for CAFOs.

How do I know which type of permit or approval I should apply for?

Choosing the correct type of permit or approval depends on your specific needs. The MO 780 0925 form outlines several options, including:

  • Construction approval
  • Operating permits (general or site-specific)
  • Permit renewals
  • Ownership transfers
  • Exemption requests
You should select the option that matches your operation's current needs. For instance, if you are initiating a new CAFO, you may need to apply for a new operation permit. If you're transferring ownership of an existing CAFO, then the ownership transfer option is appropriate.

What information do I need to provide on the form?

Applicants must complete various sections of the form depending on the type of application. Generally, you will need to provide:

  • Basic information including the operation's address, phone number, and system location.
  • Owner and continuing authority details.
  • Current approval or permit numbers, if applicable.
  • A brief description of the system and any changes since the previous permit.
  • Certification by the applicant that the information provided is true and accurate.
For certain applications, engineering certification may also be required.

What fees are associated with the application?

The fees vary based on the type of permit or approval you are seeking:

  1. Construction permit fees are $750.
  2. There is no fee for an operating letter of approval.
  3. General permit fees amount to $150.00 for the life of the permit (up to 5 years).
  4. Site-specific permit fees for new applications range from $1,500 to $5,000, based on the number of animals.
  5. Permit modification fees, including transfers, are subject to 25% of the annual fee.
Fees for renewals of site-specific permits are billed on an annual basis and do not require an initial fee submission with the application.

Are there any specific documents or reports that need to be attached?

Yes, depending on the type of application, you might need to attach:

  • Narrative summary of the project design and general layout drawings.
  • Operation and Maintenance Plan.
  • Geologic Report and Soils Report.
  • Construction Plan Drawings and specifications.
  • Nutrient Management Plan and verification of compliance with Neighbor Notice.
  • Other relevant information as required based on the type of permit or approval being sought.
Please refer to the specific sections of the application instructions for detailed requirements.

Is there a specific process for transferring ownership of a permit?

Yes. For a site-specific operating permit to be transferred to a new owner, the new owner must complete Part I of the form and indicate the request for ownership transfer. The signature of the new owner on the application certifies their understanding and agreement to abide by the facility's operating requirements. It's important to note that general operating permits and construction permits cannot be transferred.

What happens after I submit the form?

After submission, the Water Pollution Branch of the Missouri Department of Natural Resources will review your application. This review process includes assessing the completeness and accuracy of the provided information, as well as evaluating the operation's compliance with state environmental regulations. You may be contacted for additional information or clarification. Upon approval, the appropriate permit or approval letter will be issued to you.

Where can I find additional information or get help with my application?

For further assistance, you are encouraged to contact the NPDES Permits and Engineering Section of the Missouri Department of Natural Resources directly. Additionally, refer to the instructions provided with the application form and the relevant sections of the Missouri Code of State Regulations for guidance on the application process and requirements.

Common mistakes

Filling out the MO 780 0925 form for the Missouri Department of Natural Resources involves several critical steps, and mistakes can lead to delays or rejections of the application for a Concentrated Animal Feeding Operation (CAFO). Here are five common errors made during this process:

  1. Omitting required information in applicant details: Many applicants, unfortunately, leave blank spaces in Part I, which asks for detailed information about the applicant, operation location, owner, and continuing authority. It's essential to provide complete and accurate information to ensure the application is processed without delay.
  2. Incorrectly selecting the type of application: The form requires applicants to check the appropriate boxes in columns A, B, and C to indicate the type of application, such as construction, operating permit, or ownership transfer. Confusion or misselection here can lead to processing the wrong permit type, resulting in unnecessary complications.
  3. Failing to attach all pertinent information: Section 8 of Part I requires attachment of all relevant documents. Applicants sometimes overlook this requirement or assume it's unnecessary, leading to an incomplete application that cannot be processed.
  4. Forgetting to provide engineering certification: Part II of the application requires the signature and seal of a project engineer to certify that the constructed system meets approved plans and specifications. Skipping this step or submitting without the necessary certification can halt the approval process.
    • This includes both the initial certification and any "as-built" plans along with an explanation for changes from the initial design, if applicable.
  5. Incorrect payment of the fee: Depending on the application type (e.g., construction permit, operating letter of approval, general permit, or site-specific permit), a specific fee is required. Mistakes in calculating the correct amount or failing to submit the fee with the application can cause significant delays.

Ensuring careful attention to detail when completing the MO 780 0925 form is crucial for a smooth and successful submission process. Applicants are strongly advised to review each section thoroughly, attach all required documents, and verify correct fee payment to avoid common pitfalls.

Documents used along the form

When dealing with environmental compliance, particularly in the context of Concentrated Animal Feeding Operations (CAFOs), the Missouri Department of Natural Resources requires meticulous documentation to ensure adherence to established water protection standards. The main application form, MO 780 0925, serves as a comprehensive tool for CAFOs to seek approval or permits necessary for their operation. However, it often necessitates supplementary forms and documents which play crucial roles in the application process, ensuring environmental standards are met and maintained.

  • Form I and Form R: Necessary for site-specific permits, these documents provide detailed information about the site, including geographical and operational particulars that are critical for assessing environmental impact and compliance with regulatory standards.
  • Form E and G: For Class I Facilities and certain Class IB systems, these forms pertain to stormwater land disturbance permits, addressing how the facility manages stormwater runoff, a key concern for preventing pollution and protecting water quality.
  • Narrative Summary of the Project Design: This document outlines the operational design and intent of the CAFO, enabling reviewers to understand the scope and scale of operations as well as the steps taken to mitigate environmental impact.
  • Location Map: A topographic map detailing the precise location of buildings, lagoons, land application sites, and property boundaries, providing a visual assessment of the operation's layout in relation to its surroundings.
  • General layout drawings: These architectural or engineering drawings illustrate the general plan of the facility, showing the positioning of significant structures and systems which is vital for evaluating compliance with environmental and construction codes.
  • Operation and Maintenance Plan: Documentation ensuring that there is a structured approach to the efficient and safe operation of the facility, including maintenance routines vital for preventing environmental degradation.
  • Geologic Report by the Geological Survey and Resource Assessment Division: An expert analysis determining the geological characteristics of the site, essential for assessing potential environmental impacts, such as contamination risks to groundwater.
  • Soils Report: Evaluates soil types and conditions within the site, which is crucial for understanding the land's suitability for certain types of waste treatment and disposal systems.
  • Nutrient Management Plan: A strategy document outlining how the facility intends to manage the application of animal waste to land, ensuring nutrient levels remain within environmentally safe limits.

This collection of documents, coupled with the primary application form, facilitates a thorough evaluation process by the Missouri Department of Natural Resources. It ensures that CAFOs can operate within a framework that safeguards Missouri's natural resources, particularly its water bodies, from pollution and degradation. Compliance with these documentation requirements reflects an operation's commitment to environmental stewardship and regulatory adherence. Each document plays a pivotal role in painting a comprehensive picture of the operation, enabling authorities to make informed decisions that balance agricultural productivity with environmental protection.

Similar forms

The MO 780 0925 form, required for seeking approval or permits for concentrated animal feeding operations (CAFOs) in Missouri, shares similarities with various other permit applications in its structure and intent. Below are detailed how this form compares to two other types of environmental permit applications.

National Pollutant Discharge Elimination System (NPDES) Permit Application

  • Both forms are used to ensure compliance with environmental regulations, specifically aimed at protecting water quality.
  • Each requires detailed site-specific information, including location maps, site layout, and operational details.
  • Applicants must provide evidence of engineering certification and adherence to approved plans and specifications, showcasing that the constructed systems align with environmental protection goals.
  • Both entail a rigorous review process by environmental authorities, though the MO 780 0925 is focused on Missouri, while NPDES permits are federally regulated but can be administered by state agencies.

Stormwater Pollution Prevention Plan (SWPPP) Permit Application

  • Similar to the MO 780 0925 form, SWPPP applications require comprehensive information about the facility's operations and measures to mitigate pollution.
  • Both applications necessitate detailed descriptions of the system or facility in question, encompassing layout, operational features, and pollution control measures.
  • Applicants must submit supporting documents, including maps, plans, and possibly engineering certifications, to demonstrate their facility’s compliance with regulatory standards.
  • While the MO 780 0925 form specifically addresses concentrated animal feeding operations, SWPPP applications are broader, encompassing various types of facilities that might impact stormwater quality.

Dos and Don'ts

Approaching the MO 780-0925 form, a necessity for concentrated animal feeding operation approvals or permits in Missouri, demands a meticulous blend of precision and informed decision-making. Here's a comprehensive guide to help you navigate through the form submission process effectively.

What to Do:
  • Read the instructions carefully before starting the application. Understanding each section's requirements will ensure that all necessary information is provided accurately.
  • Complete all applicable parts of the form. Whether it’s for construction, operating application, or ownership transfer, make sure the relevant sections are thoroughly filled out.
  • Attach all pertinent information as mentioned in the form’s instructions. This includes but is not limited to engineering certifications, site-specific permits, and narratives summarizing the project design.
  • Ensure accuracy by double-checking the information against the requirements. Accurate latitude and longitude details, operation address, and the brief description of the system are crucial for a successful application.
  • Sign and date the form to certify that the information contained in the application and attachments is true, complete, and accurate to the best of your knowledge and belief.
  • Pay the appropriate fee as outlined in the form's instructions. Fee amounts vary depending on the type of application being submitted.
What Not to Do:
  • Don’t overlook the necessity for an engineering certification if applying for a construction permit, operating letter of approval, or general permit. This certification is essential and must be included with your application.
  • Avoid submitting incomplete applications. Missing information can lead to delays in processing or outright rejection of the application.
  • Refrain from guessing information when unsure. It’s better to seek clarification or confirm details than to submit incorrect information.
  • Do not ignore the specific requirements for the type of permit being applied for. Each category, whether it's a new operation, transfer of ownership, or a renewal, has its own set of requirements and fees.
  • Don’t forget to include the required attachments, such as as-built plans for changes in the system since the previous permit, nutrient management plans, and proof of neighbor notice verification if it's applicable.
  • Avoid using outdated forms. Always ensure you are completing the most recent version of the MO 780-0925 form to avoid any issues with outdated information or requirements.

Misconceptions

When navigating the complexities of obtaining approval or permits for Concentrated Animal Feeding Operations (CAFOs) in Missouri, individuals often encounter misconceptions about the MO 780 0925 form. It's crucial to clear up these misunderstandings to ensure that the application process is handled correctly and efficiently.

  • Only large operations need to complete the MO 780 0925 form: This is incorrect. The form is designed for both small and large operations that meet the criteria of a CAFO under Missouri's Department of Natural Resources Water Protection Program.

  • The form is too complicated and requires legal expertise to complete: Although detailed, the MO 780 0925 form is structured to guide applicants through the process. It provides clear instructions and specifies the necessary information required for approval or permits.

  • There is a fee for all types of applications: This is a misconception. While construction permits and some site-specific permits require a fee, transferring an operating letter of approval or general permit does not incur a fee. However, permit modification fees, including transfers, are subject to 25% of the annual fee.

  • Once submitted, no further information or documentation will be necessary: This is often not the case. Applicants may need to submit additional information or clarify the details in their initial application as it undergoes review.

  • The MO 780 0925 is the only form required for all CAFO-related permits: Not exactly. Depending on the specific needs of the operation, other forms such as Form E, Form G, Form I, or Form R might be required in conjunction with the MO 780 0925 form.

  • A site visit is not required for the approval process: In some cases, a site inspection may be necessary to verify the information provided in the application or to ensure compliance with state regulations.

  • Digital submissions are preferred for the MO 780 0925 form: As of the last update, applicants must submit their applications by mail to the address specified on the form. It’s important to check for any changes that might allow digital submissions in the future.

  • The form does not require detailed plans or reports: On the contrary, the application process requires comprehensive documentation, including operation and maintenance plans, geologic and soils reports, construction plan drawings and specifications, and a nutrient management plan, among others.

  • Completion of Part I is sufficient for permit renewal: This assumption is false. For permit renewals, applicants must complete all applicable parts of the form, updating any information that has changed since the original application or last renewal.

  • Ownership transfers are automatically approved with form submission: Ownership transfers require approval, and the new owner must certify understanding and compliance with the operational requirements of the facility. The process also incurs a fee equal to 25% of the annual permit fee.

Dispelling these misconceptions ensures that applicants are better prepared for the application process, leading to a smoother and more efficient journey toward obtaining the necessary approvals or permits.

Key takeaways

Understanding the nuances of the MO 780 0925 form is crucial for those involved in the management or establishment of Concentrated Animal Feeding Operations (CAFOs) in Missouri. Here are key takeaways for successfully completing and utilizing this form:

  • The form serves dual purposes, catering to applications for construction letters of approval, permit renewals, new operations, ownership transfers, site-specific permits, system modifications, and exemptions among others.
  • For a construction permit application, relevant documents including Application Form F, engineering reports, design worksheets, a nutrient management plan, and permits related to stormwater land disturbance (for Class I Facilities and certain Class IB systems) must be submitted along with a $750 fee.
  • Operating permits vary in type: letters of approval carry no fee, general permits require a $150 fee for a period up to five years, and site-specific permits have a variable fee based on the number of animals, ranging from $1,500 to $5,000 for new permits.
  • Applicants seeking a permit renewal are not required to submit a fee with their application; however, they will be billed annually.
  • Transfer of ownership for site-specific operating permits is permissible without a fee in cases where there have been no significant facility changes, but does require the completion of Part I of the form by the new owner.
  • Changes to business names and addresses where the owner, operator, and continuing authority remain the same are not considered transfers and thus do not involve transfer fees.
  • Part II of the form requires an engineering certification that includes inspection and confirmation that the constructed system meets approved plans and specifications. This section is essential for obtaining operational approval.
  • All applications must be accompanied by detailed documentation, including but not limited to operation and maintenance plans, geological and soils reports, and design specifications, to ensure the Missouri Department of Natural Resources has a comprehensive understanding of the project.

This careful delineation of requirements and processes is established to ensure that CAFOs operate in compliance with both Missouri's environmental standards and federal regulations, ultimately protecting water quality and public health.

Please rate Fill in a Valid Mo 780 0925 Form Form
4.7
(Incredible)
240 Votes